2023 年电缆沟工程项目承包合 同模板 2023 年电缆沟工程项目承包合同模板怎么写(13 篇)现今社会公众的法律意识不断增强,越来越多事情需要用到合同,合同协调着人与人,人与事之间的关系。合同对于我们的帮助很大,所以我们要好好写一篇合同。下面是小编给大家带来的合同的范文模板,希望能够帮到你哟!2023 年电缆沟工程项目承包合同模板 2023 年电缆沟工程项目 承包合同模板怎么写篇一 乙方(承包单位):party b (contractor)鉴于甲方与建设单位签订了工程建设总包合同,其中包括电缆沟施工项目需要专业施工分包人完成;鉴于乙方系具有施工资质的工程建设单位,愿意依照招标文件所规定的质量要求分包电缆沟施工项目并完成;为了按期完成合同段工程,经双方协商,在遵守总合同的基础上,根据《中华人民共和国民法典》和建设工程法律法规中的有关规定,由乙方承包本工程工程项目。为明确双方的权利、义务,特签订本合同,以共同遵守。 whereas party a have, with the owner, concluded thegeneral contract of engineering construction which is inclusive of cabletrench project needed professional constructor to complete; whereas party b isthe qualified constructor, be willing, in accordance with the qualityrequirement of bidding documents, to subcontract and complete the project;this contract: for the purpose of accomplishment of the contractedengineering, parties hereto, through negotiation and on the basis of complyingwith the general contract, in accordaded the general contract of engineeringconstruction which is inclusive of cable trench project needed professionalconstructor to complete; whereas party b is the qualified constructor, bewilling, in accordance with the quality requirement of bidding documents, tosubcontract and complete the project; this contract: for the purpose ofaccomplishment of the contracted engineering, parties hereto, throughnegotiation and on the basis of complying with the general contract, inaccordance with law of contract and relevant regulations of laws and rules onconstruction engineering, agree to award this project to party b forcompletion. in faith whereof, to specify parties hereof ‘s rights andliabilities, make and enter into this contract hereby for abidance by parties. 一、工程概况及承包内容 project overview and contracting works 1.1 工程名称及概况:工程名称:电缆沟工程。本工程涉及三个变电站,分别是现有的 220/35kv a472 变电站、现有的 35/10kv b301s 变电站以及新建的 35/10kvc581 变电站。工作内容为三个变电站之间和从三个变电站接至mv 用户的电力电缆、控制电缆、接地电缆敷设所需电缆沟的 开挖工程。 name of projectand overview: name of cable trench; the project involves three substations,namely the existing 220/35kv a472 substation, the existing 35/10kv b301s and anew 35/10kv c581 substation. work contents are the excavation works oftrenches, between three substations and from the locations of threesubstations to mv user, which are necessary for laying out power cable,control cable, earth cable. this is the power, control and grounding cabletrench excavation project among three substations and for mv users connectedto the three substations. 1.2合同形式:本合同单价为综合单价,采取固定单价承包方式。固定单价承包单价为乙方在本合同约定工期内完工的...